问题如下:
What's the ongoing work when an enterprise determines the risk tolerance?
选项:
A. Assess the probability of failure in risk management.
B. Match risk exposures consistent with risk tolerance.
C. Analyze the environment for relevant risk drivers.
解释:
B is correct.
Once the risk tolerance is set, an enterprise can step into operational level to align the risk exposure with risk tolerance.
老师,这道题目说的不是在决定风险偏好时需要做的持续性工作吗?b看起来是风险政策已经出完了以后,执行层面的事情了啊