问题如下:
6. Is Böhm most likely correct regarding Comment C that it is acceptable to use either NPV or IRR and Comment D about the immediate impact on EPS?
选项:
A.No for both comments.
B.Yes for both comments.
C.No for Comment C and Yes for Comment D.
解释:
C is correct.
Even if they are the same size, a short-term project with a high IRR can have a lower NPV than a longer-term project. The immediate impact on EPS does not capture the full effect of the cash flows over the project’s entire life.
这道题的答案是不是有问题啊 ,选A?题干中的连个说法都是错误的