问题如下:
What's the ongoing work when an enterprise determines the risk tolerance?
选项:
A. Assess the probability of failure in risk management.
B. Match risk exposures consistent with risk tolerance.
C. Analyze the environment for relevant risk drivers.
解释:
B is correct.
Once the risk tolerance is set, an enterprise can step into operational level to align the risk exposure with risk tolerance.
B选项的意思是risk budget吗??前面有题目说risk budget 是第二步