开发者:上海品职教育科技有限公司 隐私政策详情

应用版本:4.2.11(IOS)|3.2.5(安卓)APP下载

yan · 2025年02月05日

这道题的完整知识点出处在哪里

* 问题详情,请 查看题干

NO.PZ201604030300004902

问题如下:

2. Is Bornelli’s disaster recovery plan consistent with both the required and recommended standards of the Asset Manager Code?

选项:

A.

Yes.

B.

No, because the plan lacks a backup plan for monitoring, analyzing, and trading investments.

C.

No, because the plan only provides for contacting and communicating with clients during periods of extended disruption.

解释:

B is correct.

According to the guidance provided in Section D(6) of the Asset Manager Code, the level and complexity of business-continuity planning depends on the size, nature, and complexity of the organization involved. Bornelli is a large firm with hedge fund investments and it should have alternative plans for monitoring, analyzing, and trading investments if primary systems become unavailable.

这道题的完整知识点出处在哪里

1 个答案

王暄_品职助教 · 2025年02月06日

您好,business-continuity planning 是AMC:D(6)的内容,您可以去讲义查看相关内容

  • 1

    回答
  • 0

    关注
  • 5

    浏览
相关问题

NO.PZ201604030300004902 问题如下 2. Is Bornelli’s saster recovery plconsistent with both the requireanrecommenstanr of the Asset Manager Co? A.Yes. B.No, because the pllacks a backup plfor monitoring, analyzing, antrang investments. C.No, because the plonly provis for contacting ancommunicating with clients ring perio of extensruption. B is correct.Accorng to the guinproviin Section 6) of the Asset Manager Co, the level ancomplexity of business-continuity planning pen on the size, nature, ancomplexity of the organization involve Bornelli is a large firm with hee funinvestments anit shoulhave alternative plans for monitoring, analyzing, antrang investments if primary systems become unavailable. 1.Campanelli then evaluates the firm’s business-continuity plan. Unr the current plan, the technology vision backs up all of the firm’s computer systems anclient recor twiily. The back-ups are storein a fireproof storage facility offsite. 这是目前技术部门做的工作,的意思是技术部分做的工作太少了是吗?技术部门已经每天2次备份 systems anclient recor ,并存储在防火墙中,但是不够是吗?2.外聘外聘的这家 saster recovery firm公司的做法没有错误吧?这里的标黄色客户是谁?外聘公司具体方案帮我一下,谢谢Bornelli outsources certain emergenplans to a saster recovery firm. The saster recovery firm is responsible for veloping animplementing plans to communicate with employees anmission-criticvenrs ansuppliers in the event of a facility or communication sruption. The same firm also provis plans for contacting ancommunicating with clients in event of extensruption.

2023-09-02 14:41 1 · 回答

NO.PZ201604030300004902 问题如下 2. Is Bornelli’s saster recovery plconsistent with both the requireanrecommenstanr of the Asset Manager Co? A.Yes. B.No, because the pllacks a backup plfor monitoring, analyzing, antrang investments. C.No, because the plonly provis for contacting ancommunicating with clients ring perio of extensruption. B is correct.Accorng to the guinproviin Section 6) of the Asset Manager Co, the level ancomplexity of business-continuity planning pen on the size, nature, ancomplexity of the organization involve Bornelli is a large firm with hee funinvestments anit shoulhave alternative plans for monitoring, analyzing, antrang investments if primary systems become unavailable. C为什么不对

2023-08-22 19:30 1 · 回答

NO.PZ201604030300004902问题如下2. Is Bornelli’s saster recovery plconsistent with both the requireanrecommenstanr of the Asset Manager Co?A.Yes.B.No, because the pllacks a backup plfor monitoring, analyzing, antrang investments.C.No, because the plonly provis for contacting ancommunicating with clients ring perio of extensruption.B is correct.Accorng to the guinproviin Section 6) of the Asset Manager Co, the level ancomplexity of business-continuity planning pen on the size, nature, ancomplexity of the organization involve Bornelli is a large firm with hee funinvestments anit shoulhave alternative plans for monitoring, analyzing, antrang investments if primary systems become unavailable.这个continue plan到底包含几条?

2022-06-09 17:19 1 · 回答

No, because the pllacks a backup plfor monitoring, analyzing, antrang investments. No, because the plonly provis for contacting ancommunicating with clients ring perio of extensruption. B is correct. Accorng to the guinproviin Section 6) of the Asset Manager Co, the level ancomplexity of business-continuity planning pen on the size, nature, ancomplexity of the organization involve Bornelli is a large firm with hee funinvestments anit shoulhave alternative plans for monitoring, analyzing, antrang investments if primary systems become unavailable. C是什么意思呢?

2020-08-30 15:52 2 · 回答