开发者:上海品职教育科技有限公司 隐私政策详情

应用版本:4.2.11(IOS)|3.2.5(安卓)APP下载

程卤蛋蛋 · 2025年01月28日

这个经典课的视频在哪里?

* 问题详情,请 查看题干

NO.PZ202304060100015101

问题如下:

Compared with Varga’s first trade, the second trade had an effective spread cost that was:

选项:

A.

greater but was executed within the quoted spread.

B.

less but was executed outside the quoted spread.

C.

greater and was executed outside the quoted spread.

解释:

The effective spread cost estimate for buy orders is calculated as Trade size × {Trade price − (Bid + Ask/2)} or as follows:

For the first trade: 1,000 × (79.80- 77.65)/2) = 1,075.

For the second trade, there are still 200 shares offered by Dealer B at 79.95. Therefore, the effective spread cost is 1,000 × (79.95- 77.65)/2) = 1150.

The effective spread cost was larger for the second trade, and the execution price of 79.99 was executed outside the quoted spread.

rt,找了半天没找到

0 个答案
  • 0

    回答
  • 0

    关注
  • 2

    浏览
相关问题

NO.PZ202304060100015101 问题如下 Comparewith Varga’s first tra, the secontra heffective sprecost thwas: A.greater but wexecutewithin the quotesprea B.less but wexecuteoutsi the quotesprea C.greater anwexecuteoutsi the quotesprea The effective sprecost estimate for buy orrs is calculateTra size × {Tra pri− (Bi+ Ask/2)} or follows:For the first tra: 1,000 × (79.80- 77.65)/2) = 1,075.For the secontra, there are still 200 shares offerealer B 79.95. Therefore, the effective sprecost is 1,000 × (79.95- 77.65)/2) = 1150.The effective sprecost wlarger for the secontra, anthe execution priof 79.99 wexecuteoutsi the quotesprea 1.老师,这道题effective spre不是应该等于 2*(tra price- (biask)/2)么?这道题给出来的成交1000股的平均价格,和题目中给的答案是不一样的呀,这是怎么计算的呢?2.quotespre是等于market spre吧?

2024-12-10 11:00 1 · 回答

NO.PZ202304060100015101问题如下 Comparewith Varga’s first tra, the secontra heffective sprecost thwas: A.greater but wexecutewithin the quotespreaB.less but wexecuteoutsi the quotespreaC.greater anwexecuteoutsi the quotesprea The effective sprecost estimate for buy orrs is calculateTra size × {Tra pri− (Bi+ Ask/2)} or follows:For the first tra: 1,000 × (79.80- 77.65)/2) = 1,075.For the secontra, there are still 200 shares offerealer B 79.95. Therefore, the effective sprecost is 1,000 × (79.95- 77.65)/2) = 1150.The effective sprecost wlarger for the secontra, anthe execution priof 79.99 wexecuteoutsi the quotesprea 完全没看懂啊,是从哪里开始算?

2024-12-05 22:56 2 · 回答