NO.PZ2018070201000025
问题如下:
What's the ongoing work when an enterprise determines the risk tolerance?
选项:
A.Assess the probability of failure in risk management.
B.Match risk exposures consistent with risk tolerance.
C.Analyze the environment for relevant risk drivers.
解释:
B is correct.
Once the risk tolerance is set, an enterprise can step into operational level to align the risk exposure with risk tolerance.
请问讲义哪里提到了