NO.PZ2016032802000046
问题如下:
Which one of the followings is most likely correct about the composite construction?
选项:
A.Composites can include the assets managed by the firm which is not actual.
B.Composites can link performance of model portfolios with the actual performance.
C.All actual, fee-paying, discretionary portfolios must be included in at least one composite.
解释:
C is correct.
According to Composite Construction, composites must include only actual assets managed by the firm. And composites mustn't link performance of simulated or model portfolios with the actual performance.
c选项说至少在一个组合中。难道不是所有的组合中吗