NO.PZ2022090804000018
问题如下:
A project has the following annual cash flows:
选项:
A.8% B.15% C.10%解释:
SolutionB is correct. The NPV at 15% is $99.93. The NPV at 10% is –$0.01. The NPV at 8% is –$307.59.
A is incorrect. See the above calculation.
C is incorrect. See the above calculation.
老师您好。