NO.PZ202301190100003106
问题如下:
Is WCM most likely correct in claiming compliance based on the verification report?
选项:
A.No, because of the level at which verification is claimed.
Yes.
No, because of the time frame for which verification is claimed.
解释:
A is correct. For GIPS compliance, a single verification report must be issued with respect to the whole firm. Verification cannot be carried out only on a composite and, accordingly, does not provide assurance about the investment performance of any specific composite. The Standards stress that firms must not state or imply that a particular composite has been “verified.”
B is incorrect.
C is incorrect. The minimum initial period for which verification can be performed is one year, or from the firm’s inception date through the period-end if that timeframe is less than one year. The standards recommend (but do not require) that verification cover all periods for which the firm claims compliance.
麻烦老师讲下这句话“It states that during 2009, 2010, and 2011, WCM complied with all composite construction requirements for the composite and that WCM policies are designed to calculate and present performance in compliance with GIPS standards.”我印象中是说遵守GIPS要披露5年的业绩,这里怎么只披露了三年的? 谢谢